BUYER WORKSHEET
Compare electric blanket manufacturers on the same brief
Shortlist a supplier by comparing evidence against one product brief. Keep the proposed model, unresolved questions and quote assumptions visible for every candidate; a low headline price alone does not make two offers comparable.

Swipe or scroll the table horizontally to compare all columns.
| Review point | Request and record | Decision before shortlisting |
|---|---|---|
| Product and model fit | Product format, catalog reference, formal model, dimensions, textile and proposed controller. | The candidate can describe the configuration being quoted; differences from your brief are written down. |
| Commercial assumptions | Quantity, currency, delivery term, included packaging, sample cost and quote validity. | Compare the same scope. Record tooling, testing, artwork, inspection and freight exclusions separately. |
| Sample evidence | Sample revision, photographs, dimensional checks, controller review and agreed care instructions. | Record pass, open question or change required against each criterion; approve an identified sample. |
| Production and inspection | Incoming, assembly and pre-shipment checks, traceability and the proposed inspection records. | Ask how each check applies to your model and how a failed check is handled. |
| Documents and dates | Report number, model list, configuration, issuing organization and unresolved discrepancies. | Catalog references must be connected to report models in writing. Unresolved scope is an open item, not evidence of coverage. |
| Schedule and change control | Sample approval, material readiness, production, inspection and transport as separate milestones. | Agree who approves a change and which cost or date must be re-confirmed. |
1. Issue one comparison brief
Mark requirements as fixed, preferred or open. Start with the product category below, then send the same destination market, quantity, dimensions, material, controller, branding, packaging and launch window to each candidate.
2. Compare a record you can inspect
Cozynest’s documented checks include visual and physical inspection, cold and hot resistance, insulation resistance, dielectric strength and ground continuity. Confirm which checks apply to the quoted model and request the corresponding inspection plan.
3. Keep sample and MOQ assumptions visible
Most Cozynest OEM projects start from 500+ pieces. The selected material, controller and packaging determine final conditions. Ask for sample cost, timing and what a sample will prove before committing to a bulk schedule.
4. Close the open items before choosing
Record the unresolved requirement, responsible person, expected evidence and due date. Choose on the evidence and the remaining work, then use the separate sample-to-production plan to manage approvals.
Separate a supplier’s promise from the evidence
| Review | Evidence to request | Keep open until confirmed |
|---|---|---|
| Company and facility | Legal company name, factory address, contracting entity and a factory walkthrough relevant to the product. | Who makes the product and who is responsible for the order. |
| Like-for-like quotation | One version of the specification, quoted reference and formal model, included packaging and delivery term. | Any substitution, extra charge or different quantity assumption. |
| Buyer-specific requirements | Importer or retailer checklist, inspection plan, instructions and labeling revisions. | A brochure statement is not confirmation for your model. |
| Commercial handover | Named contact, written approval process and handling of a failed sample or inspection. | Who closes each issue and whether cost or schedule changes. |
Use an evidence status instead of an unsupported supplier score
For each candidate, mark the item as confirmed, evidence requested or mismatch. Record the document or sample version, reviewer and next action. A detailed answer is useful only when it can be connected to the actual model and order.
For example, if two quotes show the same catalog photograph but different controllers or packaging, ask for revised scope before comparing the unit prices. Keep a model-report mismatch open until a written link and supporting pages are available.
FAQ
Does the lowest quote identify the best supplier?
Only compare prices after quantity, specification, packaging, delivery term and exclusions match. Record differences before judging the offers.
Can a supplier’s report cover every catalog item?
No automatic connection should be assumed. Match the quoted formal model and configuration to the file, and ask for written confirmation where a catalog reference uses a different identifier.
